IDL-BNC @ IDRC >
IDRC / CRDI >
IDRC Research Results / Résultats de recherches du CRDI >

Please use this identifier to cite or link to this item: http://hdl.handle.net/10625/12238

Title: Hydraulic Ram Pump Project (Uganda) : final report
Authors: Kahangire, P.
Keywords: PUMPS
ENGINEERING DESIGN
APPROPRIATE TECHNOLOGY
UGANDA
TECHNICAL ASPECTS
FEASIBILITY STUDIES
MODELS
TESTS
SELF RELIANCE
CAPACITY BUILDING
ENERGY CONSERVATION
Issue Date: 1990
Publisher: Ministry of Water and Mineral Development, UG
URI: http://hdl.handle.net/10625/12238
Project Number: 840258
Project Title:  Hydraulic Ram Pump (Uganda)
Document Delivery: To enquire about document delivery, contact the IDRC Library : library@idrc.ca or 613-696-2578 / Pour plus de renseignements sur la livraison de documents, communiquer avec la bibliothèque du CRDI : bibliothèque@crdi.ca ou 613-696-2578
Appears in Collections:IDRC Research Results / Résultats de recherches du CRDI
Health Sciences Division / Division des sciences de la santé
1990s / Années 1990

Files in This Item:

File Description SizeFormat
89521.pdf
1.99 MBAdobe PDF
IDRC staff can log in using their network password; non-IDRC staff can request this document.

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.

 

Valid XHTML 1.0! DSpace Software Copyright © 2002-2010  Duraspace - Feedback