IDL-BNC @ IDRC >

Browsing by Titles

Jump to: 0-9 A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
or enter first few letters:   
Sort by: In order: Results/Page Authors/Record:
Showing results 25086 to 25105 of 50500
< previous   next >
Issue DateTitleAuthor(s)
1979Intergovernmental Conference on Scientific and Technological Information for Development (UNISIST II) : main issues and resultsUnesco. General Information Programme; Lohner, W.
2002Intergovernmental cooperation for mission - oriented information systems : a memoirWoolston, J.E.
1988Interim evaluation / East and Southern Africa Root Crop Research Network ProjectInternational Institute of Tropical Agriculture
1976Interim evaluation of the World Fertility Survey (WFS) : final reportWorld Fertility Survey; US. AID; UNFPA
1993Interim final report / Environmental Health Regional Information Network (CEHANET) phase II covering the period 1 April 1991 to 1 March 1993WHO Regional Office for the Eastern Mediterranean. Centre for Environmental Health Activities (CEHA)
1983Interim narrative report / Oral Rehydration Salts, Phase II : promotion of acceptability and of safe, effective useProgram for Appropriate Technology in Health
1992Interim progress report, 1 Jan.-30 Sept. 1992B.C. Hydro; Pakistan. Water and Power Development Authority
1986Interim progress report, Mar. 1985-Mar. 1986 : INFOPLAN - Brazil (preliminary phase)Instituto de Planejamento Econômico e Social; Stenzel, N.
1988Interim report, 1988 : community control of schistosomiasisTaylor, P.; Matanhire, D.; Chandiwana, S.K.
1997Interim report : making connections; an assessment of the information and communication technology needs of CREDESA for health care work in the Ouidah District of BeninCentre régional pour le développement et la santé; Bopp, M.; Neufeld, R.
2003Interim report of the ecosystem health project on plague (Tanzania) for the period Jan. 2002 - Jan. 2003 i.e. first year of implementationKilonzo, B.S.; Lwihula, G.K.; Kwesigabo, G.; Lyamuya, E.F.
2000Interim report of the technical task team to develop an effective and inclusive policy on the informal economy for the North and South central local councils-
1997Interim report on feasibility study of information / communication technology in the health sector of BeninCentre régional pour le développement et la santé
1989Interim Report on Soil Fauna and Composting in the Wadi Allaqi ProjectGhabbour, Samir; Mikhail, Wafai Z A
1983Interim report on the refugee scientists from developing countries with special reference to AfricaRwetsiba, W.W.
2012Interim review of Economy and Environment Program for Southeast Asia (EEPSEA) for the period July 1, 2007 to November 30, 2011Cruz, Wilfrido; Tran Xuan Thao
1991Interim review of training requirementsB.C. Hydro; Pakistan. Water and Power Development Authority
1993Interim technical and financial report on IDRC phase II project / Biological Evaluation of Water Quality in Running Waters of Republic of KoreaPyung-Rim Chung
1989Interim technical and financial reports : Macroeconomic Research, Brazil, phase IV, Sept. 1988 - Sept. 1989Pontifícia Universidade Católica do Rio de Janeiro, Departmento de Economia; Werneck, Rogério
1999Interim technical (narrative) report : macroeconomic and adjustment policies (MAP) - gender network, Dec. 1998 - Mar. 1999Institute of Social Studies Trust
Showing results 25086 to 25105 of 50500
< previous   next >

 

Valid XHTML 1.0! DSpace Software Copyright © 2002-2010  Duraspace - Feedback